Paegelow's Waiex-B Build Log
The construction log of Waiex-B #0021
Sunday, October 1, 2017
Forward Fuselage Side Panels Complete! (4.5)
4.5 hours
These two panels are finally done! That was quite a project; I think each panel contains about 25 parts, including the ridiculous upper longerons.