Thursday, September 13, 2018

Wheel Assemblies (0.5)

0.5 hours

I want to start working on the landing gear soon, so I figured I would see how these little wheels go together.  The two-piece wheels are very easy to install tires on since you can just take the wheels apart, but them through the tire, and bolt them together.  I got the tires/tubes installed, bolted the wheels together with the tiny brake rotors, and cautiously inflated the tires to 30psi.  They appear to be good to go.




Saturday, September 8, 2018

Panel (2)

2 hours

The next page of the plans leads to fitting the instrument panel and the glareshield.

The panel requires a little straight piece of angle to be formed to match the curve of the panel, creating a rib that will support the glareshield.  This was another task that I wasn't sure how to approach, but once I got started it ended up being pretty easy.

I just laid out where the holes would be, then added little flutes between them to form the curve.  It was tedious because I had to constantly cleco to and remove it from the panel to check how the curves matched up, but eventually I think it turned out well.





Seat Installation (6)

6 hours

Today I spent a bunch of time getting the seat installed.  It actually went together pretty quick and easy.  The seat pan gets drilled to the formers  and rear horizontal angle that I just installed, and the top of the wing spar channel.  It won't be riveted until later though.  The seat back is installed with piano hinges to the seat pan and the upper cross tie box, to make it easily removable.  Everything is drilled to size and cleaned up, which is as far as it needs to go for now!












Friday, September 7, 2018

Aft Cabin, part 4 (1.5)

1.5 hours

All the aft cabin parts, except the elevator idler, are now installed!



Wednesday, September 5, 2018

Aft Cabin, part 3 (5.5)

5.5 hours

Over the last two days I've finally gotten all the aft cabin parts fit, cleaned up, and ready to rivet.  I had to do a bunch of test fittings to figure out what Id be able to rivet together on the workbench before installing, and also to make sure I was installing everything in the correct order so I didn't block anything else that still had to go in.

I'm going to go ahead and rivet everything in, except the elevator idler assembly since that still needs some fine tuning, and it would tie the front and rear halves of the fuselage together (I'll need to split them to get out of the basement).  I also don't want to permanently attach the floor yet, so I have to be careful what I rivet!










Monday, September 3, 2018

Getting back up to speed and Aft Cabin, part 2 (4)

4 hours

I've been deployed and otherwise gone for most of this year so far, so it's been ages since I've been able to work on the plane!  Today I finally had some time to sit down and figure out where I left off.  I had to stare at the plans and parts I had laying around for a good hour and a half before I fully remembered what I was doing, and then I was back at it.

Today I got all of the remaining aft cabin parts fit and drilled together, except the elevator idler brackets.  I just need to get that thing figured out and then the next step will be to clean up all these parts and start riveting.



Saturday, December 2, 2017

Aft Cabin (3.5)

3.5 hours

Getting started assembling all the parts that go under the seat!