1.5 hours
Continuing with the pushrods. The flap and short aileron pushrods just had to be assembled from hardware; the long aileron pushrods had to be built from tube stock.
I cut the tubing to length and drilled/riveted the machined fittings to each end.
Then I just screwed in the rod end bearings. The drawing calls for an initial overall length, which I set, and then I tightened the lock nuts.
All three pairs done!
No comments:
Post a Comment