Saturday, December 29, 2018

Control Mixer (2)

2 hours

Before I install the aft fuselage floor for good, I want to get the control mixer at least mostly set up while I have full access to it.  I installed the mixer in the fuselage, and attached the rudder cables.  I wanted to get the elevator pushrod installed, but I realized I actually need to drill the hole in the pushrod that'll attach it to the mixer, and to have it in the right place I need to have the stick plus the stick-to-idler pushrod installed.  I didn't have the hardware for that on hand so I ordered it and will get the elevator pushrod done later.


No comments:

Post a Comment