Saturday, May 20, 2017

LRI Tubing Tabs (0.5)

0.5 hours

The next non-standard option I plan to add is a lift reserve indicator in the left wing, mirroring the pitot tube installation on the right.  Before I got too far a long on the left wing structure I wanted to go ahead and add some mounting tabs to the inboard few ribs to support the tubing that'll eventually go to the LRI.  Since the airframe kit only came with four tabs, I just traced the plans onto some scrap material and made an extra four for this wing.




No comments:

Post a Comment