Saturday, September 16, 2017

Aft Fuselage Side Panel Pullies (1)

1 hour

With the pulley assemblies built, I went back and attached them to the forward channel on each side panel.


 
 I noticed that one of the predrilled holes on each pulley bracket ended up over a larger tooling hole on the channel, so I drilled an extra hole next to it for a bonus rivet.


Now I can call the side panels done!



No comments:

Post a Comment